A development can meet its design brief and still present challenges when it begins operating. Maintenance access may be restricted, service routes may conflict with public areas, or shared facilities may struggle during periods of peak demand.
FM consultancy helps identify these issues while there is still an opportunity to address them.

WRITTEN BY
Rani Kawash
Executive Director
18/11/2026
SERVICES USED
Reviewing design through an operational lens
An FM design review considers how a development will be maintained, serviced and managed throughout its life.
The review starts from the owner’s defined needs and operating assumptions: the intended use, service expectations and operating model the development is expected to support. It then tests the design against them.
This involves looking beyond individual systems to understand how spaces, assets and service activities interact. Equipment may have sufficient space for installation, for example, but its future replacement could require access that the completed building cannot easily accommodate.
Key areas of review include:
• Maintenance and replacement access: Can teams safely inspect, service and replace equipment?
• Service routes and logistics: Can deliveries, maintenance teams and waste collection move efficiently through the development?
• Back-of-house provision: Is there adequate space for storage, staff facilities, equipment and operational activities?
• Cleaning and upkeep: Can façades, public spaces and difficult-to-reach areas be maintained effectively?
• Operational interfaces: Are responsibilities and access arrangements clear across buildings, public areas and shared infrastructure?
Identifying constraints during design gives the project team time to consider changes before they require physical alterations or ongoing operational workarounds.
The earlier this happens, the more influence it has. Where operational requirements are set before design begins and revisited at each design stage, operability becomes a design principle rather than a late check.
Stress Testing How The Development Will Function
A design review examines the proposed arrangement. Operational stress testing challenges it under defined scenarios.
What happens when occupancy reaches its expected peak? Can servicing continue during a major event? How would planned maintenance affect access or service continuity? What happens if a key asset becomes unavailable?
These exercises help reveal dependencies and pressure points that may be less apparent when each part of the development is reviewed separately.
For a mixed-use development, relevant scenarios might include:
• Deliveries and waste collection taking place during busy visitor periods.
• Multiple buildings drawing on shared facilities at the same time.
• Maintenance requiring the temporary closure of a service route.
• A critical equipment failure affecting occupied areas.
• An early phase operating while neighbouring phases remain under construction.
The scenarios should reflect the development’s intended use, agreed operating assumptions and stage of design. Where a question requires specialist engineering analysis, that work should inform the wider operational assessment.
Assessing Phased Occupation
Phased developments introduce particular operational challenges. Early occupants may depend on temporary access arrangements, partially completed infrastructure or services designed for a larger future population.
An FM review should examine whether each phase can operate effectively in its own right.
This includes considering how service teams will reach occupied areas, how construction and operational activities will be separated, and whether the required facilities will be available when each phase opens.
Testing these arrangements early helps teams identify dependencies that could otherwise emerge close to handover.
Turning findings into design decisions
The value of a review depends on what happens to its findings.
Each issue should be clearly recorded, with its operational consequence, priority and recommended action. Project teams can then assess the available responses and agree who is responsible for resolving it.
Some findings may require a layout change. Others may call for a revised specification, additional provision or a clearly defined operating procedure.
Tracking these decisions through subsequent design stages helps teams track and close outand that any remaining constraints are understood before occupation.
Supporting long-term performance in Saudi Arabia
FM Consultancy brings the realities of operation into the design process.
With many new developments in the Kingdom still in design, there is scope to build operational input in from the start. Developers in Saudi Arabia increasingly recognise the value of FM Design Reviews, and the practice is gradually becoming more established. They provide a structured way to challenge assumptions, examine service arrangements and identify practical constraints before handover.
The objective is to give developers and asset owners a clearer, evidence-based view of how the development is likely to be maintained, serviced and operated.